Stanton Energy AD Plant
Britcon were appointed as main contractor to carry out civils works for Host Bio Energy UK Limited. Works included:
Breaking of the base slab
Dynamic compaction of the tank area
Foundations to the pre-cast walls
Installation of the pre-cast walls
Importation of the recycled aggregates
Compact and test the material
Install the protective impermeable membrane, Digester tank building