Stanton Energy AD Plant

Britcon were appointed as main contractor to carry out civils works for Host Bio Energy UK Limited. Works included:

Breaking of the base slab

Dynamic compaction of the tank area

Foundations to the pre-cast walls

Installation of the pre-cast walls

Importation of the recycled aggregates

Compact and test the material

Install the protective impermeable membrane, Digester tank building