Balloch Bridge
-
Sector
Bridges
-
Duration
8 Weeks
-
Location
Balloch, Dumbartonshire
-
Form of Contract
-
Overview
Britcon Engineering Services involvement in this contract comprised the design, fabrication, delivery and erection of a three span bridge deck across the River Leven in Dumbartonshire.
The project involved removal and replacement of the original five span bridge with a new deck incorporating cantilevered outboard pedestrian walkways.
A separate contract was undertaken for specialist handrailing systems for the bridge.
![](/rails/active_storage/representations/eyJfcmFpbHMiOnsibWVzc2FnZSI6IkJBaHBBdVFGIiwiZXhwIjpudWxsLCJwdXIiOiJibG9iX2lkIn19--d2223be608b47dc1582de5c96149e80cfeeae33b/eyJfcmFpbHMiOnsibWVzc2FnZSI6IkJBaDdDem9VWTI5dFltbHVaVjl2Y0hScGIyNXpld2s2RUdGMWRHOWZiM0pwWlc1MFZEb01aM0poZG1sMGVVa2lDMk5sYm5SbGNnWTZCa1ZVT2d0eVpYTnBlbVZKSWcweE9USjRNVEE0WGdZN0NGUTZDV055YjNCSkloQXhPVEo0TVRBNEt6QXJNQVk3Q0ZRNkNuTjBjbWx3UmpvVWMyRnRjR3hwYm1jdFptRmpkRzl5U1NJS05Eb3lPakFHT3doVU9neHhkV0ZzYVhSNVNTSUhPVEFHT3doVU9nNXBiblJsY214aFkyVkpJZ2xLVUVWSEJqc0lWRG9QWTI5c2IzSnpjR0ZqWlVraUNYTlNSMElHT3doVSIsImV4cCI6bnVsbCwicHVyIjoidmFyaWF0aW9uIn19--198b5b5a6ab6833d2e51b2afa74b6ee7399ecd99/080.jpeg)